Laserfiche WebLink
EXHIBIT A <br />SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY <br />RESOLUTION NUMBER 1995-1 3 <br />ALLOCATION AMONG MEMBERS <br />ANAHEIM <br />AZUSA <br />BANNING <br />BURBANK <br />COLTON <br />GLENDALE <br />IMPERIAL <br />LOS ANGELES <br />PASADENA <br />RIVERSIDE <br />VERNON <br />TOTALS <br />50% BASED ON 1993-94 ENERGY 50% BASED ON EQUAL SHARES <br />, . ALLOCATION <br />$2,323.78 <br />$147.58 <br />$79.20 <br />$753.43 <br />5 164.47 <br />$788.73 <br />$1,720.21 <br />$16,117.83 <br />$882.06 <br />$1,208.08 <br />$81 4.63 <br />$25,000.00 <br />(111 1) <br />ALLOCATION <br />$2,272.73 <br />$2,272.72 <br />$2,272.72 <br />$2,272.73 <br />$2,272.72 <br />$2,272.73 <br />$2,272.73 <br />$2,272.73 <br />$2,272.73 <br />$2,272.73 <br />$2,272.73 <br />$25,000.00 <br />TOTAL <br />$4,596.51 <br />$2,420.30 <br />$2,351.92 <br />$3,026.1 6 <br />$2.437.1 9 <br />$3,061.46 <br />$3,992.94 <br />$1 8,390.56 <br />$3.1 54.79 <br />$3,480.81 <br />$3,087.36 <br />$5O,OOO.OO